Home - News - Details

Binding Operation:

A. Remove the paper dust from the drill hole to avoid damage to the machine.

B. Remove the cut nylon tube from the discharge port and insert it into the drilled hole.

C. Move the binding part to the heating body on the right side of the workbench, and press the “down” button on the right side of the electric operation panel to align the inner hole of the nylon tube with the positioning pin. After the heating body is pressed to the nylon tube, press the “pressing riveting” button. After about 5 seconds, the upper heating body is automatically reset and the binding is completed.

750-18

Send Inquiry

You Might Also Like